Corrigendum for Postponement of Tender for Selection of Solar Power Developer for Setting up of 100 MW Grid-Connected Solar PV Power Project at Jiribam, Manipur Post author:Manireda Post published:May 18, 2021 Post category:News Corrigendum for Postponement of Tender for Selection of Solar Power Developer for Setting up of 100 MW Grid-Connected Solar PV Power Project at Jiribam, Manipur You Might Also Like Notice for opening of the Price Bid for 500kWp & 200kWp grid connected Solar Power Plant at Yaingangpokpi and Churachandpur Sub-Station,Manipur respectively May 25, 2017 Public Notice regarding Roof Top Solar Power Plant January 21, 2017 Tender for Design, supply, installation and commissioning of grid connected Solar Power Plant of 200 kWp capacity each including 5 years MPWC at 132/33 KV Power Sub-Station at (i) Yaingangpokpi, Ukhrul District, Manipur & (ii) Jiribam, Jiribam District, Manipur October 13, 2018
Notice for opening of the Price Bid for 500kWp & 200kWp grid connected Solar Power Plant at Yaingangpokpi and Churachandpur Sub-Station,Manipur respectively May 25, 2017
Tender for Design, supply, installation and commissioning of grid connected Solar Power Plant of 200 kWp capacity each including 5 years MPWC at 132/33 KV Power Sub-Station at (i) Yaingangpokpi, Ukhrul District, Manipur & (ii) Jiribam, Jiribam District, Manipur October 13, 2018