Pre-bid Discussion Committee for 50 MW Grid Connected Solar SPV Power Plant at Jiribam, Manipur Post author:Manireda Post published:June 24, 2021 Post category:News Pre-bid Discussion Committee for 50 MW Grid Connected Solar SPV Power Plant at Jiribam, Manipur You Might Also Like NIT for (i) Design, supply, installation and commissioning of 25kW SPV Power Plant at Directorate of Economics and Statistics, Lamphelpat, Imphal, Manipur & (ii) 700 Nos. of 7W White LED based Solar Street Lighting Systems aggregating 28 kWp at Imphal West Zilla Parishad in the State of Manipur December 16, 2016 Corrigendum for Postponement of Tender for Selection of Solar Power Developer for Setting up of 100 MW Grid-Connected Solar PV Power Project at Jiribam, Manipur May 18, 2021 2nd Corrigendum in respect of NIB No. MANIREDA/SPP/INA/2016/3 for implementation of 25kWp SPV Power Plant at INA Memorial Complex, Manipur July 21, 2016
NIT for (i) Design, supply, installation and commissioning of 25kW SPV Power Plant at Directorate of Economics and Statistics, Lamphelpat, Imphal, Manipur & (ii) 700 Nos. of 7W White LED based Solar Street Lighting Systems aggregating 28 kWp at Imphal West Zilla Parishad in the State of Manipur December 16, 2016
Corrigendum for Postponement of Tender for Selection of Solar Power Developer for Setting up of 100 MW Grid-Connected Solar PV Power Project at Jiribam, Manipur May 18, 2021
2nd Corrigendum in respect of NIB No. MANIREDA/SPP/INA/2016/3 for implementation of 25kWp SPV Power Plant at INA Memorial Complex, Manipur July 21, 2016