Corrigendum for Design, supply, installation and commissioning of grid connected Solar Power Plant of 200 kWp capacity each including 5 years MPWC at 132/33 KV Power Sub-Station at (i) Yaingangpokpi, Ukhrul District, Manipur & (ii) Jiribam, Jiribam District, Manipur

  • Post author:
  • Post category:News

Dowload Corrigendum for Design, supply, installation and commissioning of grid connected Solar Power Plant of 200 kWp capacity each including 5 years MPWC at 132/33 KV Power Sub-Station at (i) Yaingangpokpi,  Ukhrul District, Manipur & (ii) Jiribam, Jiribam District, Manipur